Commercial Construction Process

Commercial Construction Process


1. Construction Planning
An effective construction plan can have a massive impact on the overall project. At this stage, you want to identify the most ideal site for your building. You’ll need to plan out a budget analysis and project schedule for the entire project. It’s important that you choose your architect and general contractor at this step as well so that they can be involved throughout the planning.
2. Building Design
The building design stage comes next. At this point, you should aim to craft a building plan which achieves the following things:
Outline the size and functions of rooms and common spaces
Get clarity on building orientation and connection to utility systems
Determine project feasibility, especially with building codes and regulations
Accurately forecast project timeline and costs
In this stage of the commercial construction process, architects confer with the project owner to understand the project’s needs and goals. The experts then proceed to create rough sketches that illustrate the basic concepts of the design. The design team should also be asked to produce schematics that detail materials, sizes, textures, and colors.
It’s much easier to obtain accurate budget projections when your team works in tandem. You might want to rope in feasibility consultants and environmental specialists as well so that they can validate your building design and projections. This prevents nasty surprises later on in the shape of non-compliance notices.
3. Feasibility Analysis
Feasibility assessment involves a consideration of amenities and site requirements. The assessment helps to determine the viability of the commercial project based on site access, utility connections, and building orientation, among other determinants. Even an architecturally impressive building can fail if these factors aren’t planned from the get go.
4. Design Build
Design development builds on schematic designs. It involves fine-tuning the design drawings on details such as materials, structural features, and windows, and door locations. Schematic design drawings include civil site plans, detailed floor plans, roof plans, room plans, building sections, elevations, and other details.
5. Working Drawings
Working drawings are the final step of the overall design stage. At this point, all stakeholders would have agreed upon a building plan and put together contract documents. These will be used as a bid package that contractors can understand and determine whether they want to go ahead with a tender offer.
Working drawings are also complemented by specifications, which are written documents describing the materials to be used, their installation methods, and expected outcomes. The written documents offer further insight into the drawings and form part of the contract.
6. Bidding
A commercial construction bidding process takes place in parallel with the design mockup stage. Bidding is used to publicize the construction tender and evaluate proposals from interested parties. The process helps you get a responsible and reliable contractor to take charge of the project.
The success of the bidding process is dependent on well-crafted working drawings and bid packages. They should include information such as building plans, specifications, schedule information, and quantity lists.
7. Pre-Construction
This is when the project, quite literally, starts to get off the ground. Vendors and subcontractors are provided lists of materials in order to get quotes. Ideally, you should ask for at least 3 different estimates to maintain a competitive process.
The project manager takes ownership of obtaining the necessary building permits and insurance requirements. Soil testing and environmental investigation are also undertaken to limit hazards and complications during construction.
8. The Commercial Construction Procurement Process
The construction manager purchases all the materials, equipment, and labor needed in the construction process. A contractual purchase order is created between the seller and the contractor to ensure that the obtained products perform as expected.
9. Construction And Post-Construction
The building process begins with a meeting where you reach an agreement on working hours, material storage, and quality control. Breaking ground starts with excavation and installation of underground utilities.
Depending on the design, the next step would be concrete pouring and steel erection, followed by the framing, roofing, exterior and interior works. The construction inspector and project manager are in charge of quality control at each step of the process.
Lastly, project analysis is done after construction is completed – this is commonly known as a punch list, which includes a list of work that does not meet specifications. In order for the final round of funds to be released to the GC, this list must be completed.
This also helps construction companies identify minor issues and tweaks that will be required before building occupancy. These could include replacing cracked tiles or fixing leaky faucets.
After that, the architect issues a certificate of completion. A building official then conducts the final inspection before the building opens for the public.
And there you have it – the commercial construction process from start to finish.